Europe cannot build grid fast enough. Regulation now requires network operators to connect flexibly — and, since January 2026, to prove what their smart grid actually delivers. FLEX turns the grid that already exists into more capacity, and into the numbers regulators ask for. Pure software, no hardware.
Solar, heat pumps, EV charging and data centres all want a connection — faster than operators can reinforce.
New lines and transformers mean permits, supply chains and capital — reinforcement alone cannot close the gap in time.
Static limits and manual operation leave capacity unused, while operators lack the tools to use the flexibility already connected.
The EU set the frame, member states are writing dates into law, and regulators now measure outcomes. Every grid operator in Europe needs the same capability — on a deadline.
Three engines combine physics and reinforcement learning. The operator always decides; FLEX keeps the record.
Topology Time Machine: the network as it was at every point in time — the audit trail behind each KPI.
Dynamic Operating Envelopes: safe import and export limits per connection point, every 15 minutes.
RL agents combine taps, reactive power, batteries, heat pumps and EVs to raise hosting capacity.
Software licence per grid area, plus the annual KPI report regulators expect each year.
EU rules and common KPIs mean the same product fits every member state — local rules become configuration.
Runs on data operators already have, in open formats — CIM/CGMES, pandapower, OpenDSS, PSS/E.
Consulting and integration partners carry FLEX into new markets without a local team per country.
Lower peak line loading on a real distribution grid, measured with Stadtwerke Kapfenberg.
Day-ahead topology plans on real TenneT data, 1,659 substations, N-1 secure.
Of voltage violations mitigated on an Enel distribution grid, ~5,000× faster than baseline.
FLEX complements grid equipment, control systems and service portfolios — and opens a shared route to operators across Europe.
A deadline-driven need in every EU market, a research lead built since 2017, and a team that has built and sold a venture before.
Annual licences and KPI reporting across grid areas — a platform we are happy to get to know early.
We share our investor briefing — market map, traction and plan — after a short introductory call.